Buttrflwr
Well-Known Member
Summary
Replace the 2-day production option for manufactories and the 15 minute production option for Workshops, with a 12-hour production option.
Description
I would like to suggest a 12 hour production time, as for some of us that work long hours with no net access, 9 is just not enough, and 24 is ridiculous if I am truly playing the game.
Motivation
I hate my factories and workshops sitting idle for 2-3 hours until I can get home. There is too great a disparity between the 9 hour production time and the 1 day (24h) production time.
Possible downsides
Might lead to less activity from players who would normally go for the 9-hour options? Should be sorted out.
Replace the 2-day production option for manufactories and the 15 minute production option for Workshops, with a 12-hour production option.
Description
I would like to suggest a 12 hour production time, as for some of us that work long hours with no net access, 9 is just not enough, and 24 is ridiculous if I am truly playing the game.
Motivation
I hate my factories and workshops sitting idle for 2-3 hours until I can get home. There is too great a disparity between the 9 hour production time and the 1 day (24h) production time.
Possible downsides
Might lead to less activity from players who would normally go for the 9-hour options? Should be sorted out.
Last edited by a moderator: