Prueba2
Well-Known Member
Ok, just one hint.
It seems Seasons rewards are tipped to combat
Considerations: TeamSpirit Chapter, lvl31 Manufactories, lvl21 Merc Camp (sorry the snapshoots I have are from Live server)
a1) 138000 T3 => 138000 * (Prod 9h 53800 tools/ 13440 T3) = 552411 tools
a2) 138000 T3 => 138000 * (Prod 3h 29400 tools/ 7360 T3) = 551250 tools
b) 10 Toad squads => 10 squads * ( 1421 toads/ 1 squad) *(Merc prod 48778 tools / 841 toads) = 824180 tools
option b is like +50% better
a) 34500 T3+2 => 34500 T3+2 * (Trade 3* 105 T3 / 100 T3+2) * (Prod 9h 53800 tools/ 13440 T3) = 145008 tools
b) 10 MercWiz squads => 10 squads * ( 1894 MerWiz/ 1 squad) *(Merc prod 48246 tools / 1122 MercWiz) = 814420 tools
option b is like +460% better
a) 157500 T2+2 => 157500 T2+2 * (Trade 3* 105 T2 / 100 T2+2) * (Prod 9h 13400 tools/ 13440 T2) = 164883 tools
b) 15 MercArcher squads => 15 squads * ( 5682 MerArcher/ 1 squad) *(Merc prod 47124 tools / 3366 MercArcher) = 1193220 tools
option b is like +625% better
a) 138000 T3+1 => 138000 T3+1 * (Trade 3* 105 T3 / 100 T3+1) * (Prod 9h 53800 tools/ 13440 T3) = 580031 tools
b) 15 Toad squads => 15 squads * ( 1421 toads/ 1 squad) *(Merc prod 48778 tools / 841 toads) = 1236270 tools
option b is like +115% better
EDIT: To include 3h production option, result is similar
It seems Seasons rewards are tipped to combat
Considerations: TeamSpirit Chapter, lvl31 Manufactories, lvl21 Merc Camp (sorry the snapshoots I have are from Live server)
a1) 138000 T3 => 138000 * (Prod 9h 53800 tools/ 13440 T3) = 552411 tools
a2) 138000 T3 => 138000 * (Prod 3h 29400 tools/ 7360 T3) = 551250 tools
b) 10 Toad squads => 10 squads * ( 1421 toads/ 1 squad) *(Merc prod 48778 tools / 841 toads) = 824180 tools
option b is like +50% better
a) 34500 T3+2 => 34500 T3+2 * (Trade 3* 105 T3 / 100 T3+2) * (Prod 9h 53800 tools/ 13440 T3) = 145008 tools
b) 10 MercWiz squads => 10 squads * ( 1894 MerWiz/ 1 squad) *(Merc prod 48246 tools / 1122 MercWiz) = 814420 tools
option b is like +460% better
a) 157500 T2+2 => 157500 T2+2 * (Trade 3* 105 T2 / 100 T2+2) * (Prod 9h 13400 tools/ 13440 T2) = 164883 tools
b) 15 MercArcher squads => 15 squads * ( 5682 MerArcher/ 1 squad) *(Merc prod 47124 tools / 3366 MercArcher) = 1193220 tools
option b is like +625% better
a) 138000 T3+1 => 138000 T3+1 * (Trade 3* 105 T3 / 100 T3+1) * (Prod 9h 53800 tools/ 13440 T3) = 580031 tools
b) 15 Toad squads => 15 squads * ( 1421 toads/ 1 squad) *(Merc prod 48778 tools / 841 toads) = 1236270 tools
option b is like +115% better
EDIT: To include 3h production option, result is similar